SUPPORT THE 50M SWIMMING POOL

Please support Sea Lanes with a positive comment on the application to build the heated 50m outdoor swimming pool

Support

The National Open Water Swimming Centre®

Opening in Spring 2022, Sea Lanes Brighton will transform the former Peter Pan site on Madeira Drive, Brighton

Future Plans
Brighton Madeira Drive
N/A High Tide
N/A Low Tide
N/A Water Temperature
N/A Wind Speed
N/A Swell

Latest News

View all